Thermal Insulation Composite System & Facade

Layer by layer to an energy-efficient home: Our photo series documents the exterior plastering work on our new build. From mounting the EPS boards and embedding the reinforcement mesh, to the painting work.

  • WDVS thermal insulation with 18 cm EPS and XPS boards on the facade
  • Stacked EPS insulation boards stored in the garden for the WDVS facade
  • EPS insulation boards mounted on the sand-lime brick wall
  • EPS insulation at the entrance area and parapet of the new build
  • 18 cm EPS and XPS insulation on the north side of the house
  • Telescopic electrical box for an outdoor socket set into the WDVS insulation
  • WDVS insulation work on the facade during winter
  • WDVS insulation on the garden side of the new build
  • Plinth waterproofing at the base of the WDVS facade
  • Telescopic mounts for cameras and lamps embedded in the facade insulation
  • WDVS insulation at the junction between house and garage
  • WDVS insulation around the steel beam of the loggia
  • WDVS insulation around the loggia opening
  • Telescopic device box installed within the facade insulation
  • Kaise telescopic device mount integrated beneath the WDVS insulation
  • WDVS facade insulation work in progress
  • Air conditioning hoses and cables routed beneath the WDVS insulation
  • WDVS insulation work in the entrance area of the new build
  • Reinforcement mesh and base coat around the external blind box
  • Plastered recesses for the external venetian blinds
  • Windows masked with film ahead of the plastering work
  • WDVS insulation applied to the loggia ceiling
  • WDVS insulation on the garage, outbuilding and main house
  • Insulation boards installed on the lower level walls
  • 180 mm EPS insulation on the lower level of the house
  • Recesses for external blinds cut into the WDVS insulation
  • Exterior rendering work on the loggia walls
  • Device mount set into the facade insulation
  • Exterior render on the garage and the adjoining house wall
  • Blind box cladding integrated into the WDVS facade
  • WDVS insulation in the lower level and on the loggia ceiling
  • Window sills and the wall penetration for the AC outdoor unit
  • Exterior render on the garden-facing facade of the new build
  • Exterior rendering work on the north side of the house
  • Choosing the facade colour with the maxit colour fan deck
  • Masked blind claddings prepared before the plastering work
  • Plasterer rendering the facade on the entrance side
  • Transition between plinth render and exterior render
  • WDVS insulation meeting the roof edge of the new build
  • Plastered external blind box running around the corner
  • Exterior render on the soffit and the external blind recesses
  • Base coat applied over the EPS insulation boards
  • Fixings for the timber slat facade set in concrete beneath mineral wool insulation
  • Recesses in the WDVS for the timber facade mounts
  • Finished exterior render before the facade is painted
  • The fully rendered house before the final coat of paint
  • Transition from exterior render to plinth render on the slope side
  • Exterior render in the loggia and on its ceiling
  • Rendered parapet and wall in the entrance area
  • Rendered exterior ceiling of the new build
  • Colour samples of maxit facade paints on the wall